"...In the beginning was the Word..."

(Translation)

Roads

...

Memorandum
Preliminary Study of Road Connection between the New International Deep Water Sea Harbor and the ... Zone

Meeting held [date] at the [location]

Present:
[persons present]

1. [Company A]announced that the purpose of the meeting was to acquaint (the Public Works Department), (the Municipality) and the private entities directly interested, with the five alternative Drawings submitted by .. - .., namely A, B, C, D and E, in the ambit of the Preliminary Study of a Road Connection that shall cross the .. .. to link the .. Zone with the entrance of the future bridge to the projected International Deep Water Sea Harbor to be built off the coast of .... Such alternative plans were outlined in the Drawings of the East Area of .., which had been previously distributed amongst the entities convened for the Meeting and in the Chorographic Sketch no.: .. ....-.. of June ...., made available at that time by ..., attached to the present Memorandum.
2. [Company A] described in general terms each of the five options presented and informed that a recent Traffic Study evidenced the need for a two-lane road with center track separator with a width of 3.5 meters per lane and a 2.5 m shoulder. The basic speed considered, as defined in the five alternatives and described in the Preliminary Study, was 100 km per hour, with minimum radius of 400 meters. This basic speed had to be reduced to 80 km per hour in certain extensions on Drawings B, C, D, and E where the radius of curvature could not be drawn beyond 300 meters. Furthermore, ... pointed out that the solutions drafted imply the execution of two tunnel sections. On the other hand the Study provides the re-establishment of the existing road system and the insertion of connections to the main origin-destination hubs, common to the different Drawings.
3. [Company B] affirmed that the need to access the Power Plant from the ... side is satisfactorily assured in Drawings A and B. Concerning the excavation of the second tunnel near its Power Plant, ... alerted that the intensity of the vibrations and the amount of dust may affect the functioning of the generators installed at the Power Plant.
4. The [..] Factory considered Drawings A the most favorable because of the greater benefits with the traffic of heavy vehicles from its factory in comparison to the present conditions. On the other hand, Drawings A have advantage towards Drawings B as during construction, they will have less effect on traffic using the present road of access to the same factory.
5. [Company C] affirmed to prefer, in principle, a plan for a Road Connection that would benefit directly the traffic generated by of the ... Industrial Zone, such as in the case of solutions A and B, thus excluding solutions C, D and E. However, Drawings B would be unacceptable because of taking up land already granted to [Company C], present location of some ..-..Port facilities and destined to the construction of the Company's main office.
6. ... affirmed that it has not been able to examine the projects submitted by ... thus it should only issue an opinion on a latter date.
7. ... emphasized that if any of the Drawings C, D and E were to be adopted, the environment impact of the Road Connection on the ..-...Valey would be significant, as it spreads throughout an approximate extension of 500 meters in open air. Such environmental impact would result chiefly from the great amount of exhaust fumes emitted by the intense traffic of heavy vehicles circulating on the road in question. The ..-...Valey does not offer good conditions for dispelling such fumes, as evidenced by the morning fog usually found at the location. Air pollution in the area would be as much damage as it is inserted in the ... Natural Park and would affect a residential complex already projected under the ... Alignment Plan and the ..-...Urbanization. In what concerns Drawings A and B, ... emphasized the need to respect the borders of a land plot already granted, near the .. .. de ..-..Road, for construction of a .. ..... Training Center at the location of the former .. Refugee Center. Another adjustment to Drawings A, which ...ould consider necessary, was to increase partially through the second tunnel the 400-meter radius planned for the designed curvature.
8. The opinions issued by the entities present at the meeting converged towards the approval of the plan proposed in Drawings A, subject to specific adjustments whether as to comply with ... suggestions or as to avoid interference with the ..-...Port facilities. Thus, ... scheduled another meeting with .. and ... for July .., ... in order to approve the adjustments that are to be made.
(sd.)

 

 

Home